Engineer Control

Engineer Schedule SOP

Engineer scheduling SOP for COLORJET technical service and field operations.

Engineer Control

Engineer Scheduling Rules

Use these rules to control who is free, who is on service, and which service tickets are pending.

Availability Status

Every engineer should have status: Free, Assigned, On-Site, Remote Support, Leave or Training.

Ticket Priority

Emergency production stop, warranty issue, installation, calibration and routine maintenance should be separated.

Parts Requirement

Before sending engineer, confirm required parts: head, damper, cap, pump, board, cable, sensor or ink system.

Visit Confirmation

Confirm customer location, contact person, machine model, issue type and expected arrival time.

Service Report

Engineer must submit work done, parts used, photo, customer signature and next recommendation.

Pending Review

Pending service should be reviewed daily by support control and weekly by management.